Phased renplacement of concrete panel blocks opened up a beautiful canalside site. About 350 units in total over 5 phaseswith 3 different contractors.
Worked from site located office to enable unusually high degree of resident consultation
We had to blow up two tower blocks to clear site for later phases
Sorry, the comment form is closed at this time.